Arizona Could Be Ground Zero in U.S. Microchip Self-Reliance

Estimated Reading Time: 2 minutes

Arizona’s technology sector will play a prominent role in American manufacturing’s latest plan to reclaim its title as the world’s leader in semiconductors from Asia.

One of the lessons learned from the COVID-19 pandemic was the need for U.S. manufacturing companies to diversify their supply chains. Semiconductor production slowed to a crawl in 2020, causing microchip shortages worldwide. The void in chips led to a systemic supply chain disruption in several industries, most notably for automobile manufacturers.

According to semiconductor industry leaders, the answer to that dilemma in domestic production is the National Semiconductor Economic Roadmap. The Arizona Commerce Authority said Tuesday the plan would address three steps necessary to creating a thriving semiconductor manufacturing sector in the U.S.: finding and training a workforce, establishing a resilient supply chain, and installing the surrounding infrastructure.

“Today more than ever, we see the strategic importance of a robust U.S. semiconductor industry,” said Pat Gelsinger, CEO of Intel. “Intel has been at the forefront of designing and manufacturing semiconductors in the United States for over 50 years, and many of our leading commercial and technological innovations have grown out of Arizona.”

The group’s first meeting is planned for October, with the final roadmap unveiling due in July 2022.

“States have a pivotal role to play in advancing U.S. competitiveness,” Arizona Gov. Doug Ducey said. “Arizona looks forward to engaging with other states and industry leaders to establish an industry-led roadmap to help drive U.S. semiconductor leadership for decades to come.”

The U.S. once was a major supplier of semiconductors, the silicon-centric material used in microchips that power electronic devices, but 80% of the facilities are now based in Asia.

With Intel announcing in March a $20 billion plan to build two more fabrication facilities (fabs) in Arizona and the Taiwan Semiconductor Manufacturing Company’s plans to build a new fab in Phoenix, the state is expected to see a large share of the planned expansion.

“As Arizona’s experience has shown, states are on the front lines of semiconductor investment and attraction,” Arizona Commerce Authority President Sandra Watson said in a news release. “We’re proud to help lead this historic effort alongside our state and industry partners to develop a shared vision, one that can help drive American semiconductor leadership for decades to come.”

The Arizona Commerce Authority said Arizona is one of the “top-four” states for semiconductor industry share.

*****

This article was published on September 28, 2021, and is reproduced with permission from The Center Square.

TAKE ACTION

The Prickly Pear’s TAKE ACTION focus this year is to help achieve a winning 2024 national and state November 5th election with the removal of the Biden/Obama leftist executive branch disaster, win one U.S. Senate seat, maintain and win strong majorities in all Arizona state offices on the ballot and to insure that unrestricted abortion is not constitutionally embedded in our laws and culture.

Please click the TAKE ACTION link to learn to do’s and don’ts for voting in 2024. Our state and national elections are at great risk from the very aggressive and radical leftist Democrat operatives with documented rigging, mail-in voter fraud and illegals voting across the country (yes, with illegals voting across the country) in the last several election cycles.

Read Part 1 and Part 2 of The Prickly Pear essays entitled How NOT to Vote in the November 5, 2024 Election in Arizona to be well informed of the above issues and to vote in a way to ensure the most likely chance your vote will be counted and counted as you intend.

Please click the following link to learn more.

TAKE ACTION
Print Friendly, PDF & Email
COPYRIGHT © 2024 PRICKLY PEAR COMMUNICATIONS, LLC. ALL RIGHTS RESERVED.